Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.01uF 630V fr tube amp audio free shipping
Technical Details
Application: | Residential / General-Purpose |
Brand Name: | Cayyi |
Extension Cable Length: | None |
Grounding: | Non-Grounding |
Master Switch: | No |
Model Number: | 10x103/630 |
Outlets Number: | 1 |
Overload Protection: | No |
Rated Current: | NONE |
Rated power: | NONE |
Rated Voltage: | 110-250V |
Single USB Max Output: | None |
Sub-control Switch: | No |
Support Quick Charge: | No |
Surge Protector: | No |
Synchronous Rectification Technology: | No |
Type: | tube sockets |
USB Ports Number: | None |
USB Total Power: | NONE |
WIFI: | No |
Price history chart & currency exchange rate