Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.0047uF 630V fr tube amp audio free shipping

Wholesale and retail long leads yellow Axial Polyester Film Capacitors electronics 0.0047uF 630V fr tube amp audio free shipping
sku: 32708106286
ACCORDING TO OUR RECORDS THIS PRODUCT IS NOT AVAILABLE NOW
$6.98
Shipping from: China
   Technical Details
Application: Residential / General-Purpose
Brand Name: Cayyi
Extension Cable Length: None
Grounding: Non-Grounding
Master Switch: No
Model Number: 10x472/630
Outlets Number: 1
Overload Protection: No
Rated Current: NONE
Rated power: NONE
Rated Voltage: 110-250V
Single USB Max Output: None
Sub-control Switch: No
Support Quick Charge: No
Surge Protector: No
Synchronous Rectification Technology: No
Type: tube sockets
USB Ports Number: None
USB Total Power: NONE
WIFI: No
   Price history chart & currency exchange rate

Customers also viewed