$ USD
€ EUR
руб. RUB
грн. UAH
eng
рус
укр
Home
Hot Sale
Notifications
Favorites
Stores
Search
aliexpress.com
/
Security & Protection
/
Workplace Safety Supplies
X-ray gamma ray protective 0.5mmpb long lead vest nuclear power plants radiological protection double sided lead vest overcoat
sku: 1005007049938835
$210.81
8,590.00 грн.
+1%
~
8,670.00 грн.
$210.81, $1.00 = 41.15 грн.
18,460.00 руб.
+4%
~
19,200.00 руб.
$210.81, $1.00 = 91.07 руб.
€ 193.00
-1%
~
€ 191.00
$210.81, € 1.00 = $1.11
Shipping from: China
the store does not ship to your country
Price history chart & currency exchange rate
Customers also viewed
in this store
in other stores
86%
$189.80
Genuine gamma ray x-ray radiological protection 0.5mmpb lead clothing nuclear radiation protective double-sided long vest
+1%
78%
$185.23
X-ray gamma ray protective 0.5mmpb long lead vest coat radiology department radiological protection double sided lead clothes
-9%
76%
$198.46
X-ray gamma ray protective 0.5mmpb long lead vest nuclear power plants nuclear radiation protection sleeveless lead apron
-1%
71%
$265.96
Genuine x-ray gamma ray protective 0.5mmpb long sleeved double sides lead overcoat radiological protection adult lead clothes
65%
$63.80
Direct Selling gamma ray x-ray radiological protection 0.5mmpb Children short apron nuclear radiation protective lead vest
-2%
63%
$189.06
Genuine x-ray gamma ray protective clothing Hospital nuclear power plant radiological protection 0.5mmpb lead rubber coat
-1%
61%
$297.81
Good quality x-ray gamma ray protective 0.5mmpb long sleeved lead vest and lead skirt nuclear radiation protection lead clothes
60%
$218.48
Recommend x-ray gamma ray protective 0.5mmpb short sleeved lead apron nuclear radiation protection double sided lead clothes
53%
$223.60
Genuine x-ray gamma ray protective 0.5mmpb long sleeved lead coat radioactive laboratory radiological protection lead clothes
+1%
50%
$101.68
X-ray gamma ray protection 0.5mmpb short lead vest radioactive factories radiological protective high-quality short lead apron
-6%
48%
$84.31
x-ray gamma-ray radiological protection 0.5mmpb lead vest apron overcoat nuclear radiation protective double sided lead clothes
+1%
47%
$194.17
Genuine x-ray gamma ray protective 0.5mmpb children short sleeved lead vest and lead skirt radiological protection lead clothes
-24%
46%
$159.75
X-ray gamma ray protective 0.5mmpb child short sleeved lead overcoat nuclear radiation protection children lead clothes
+1%
44%
$235.12
X-ray gamma ray protective 0.5mmpb short sleeved lead apron set radiological protection short sleeved lead vest and lead skirt
+4%
41%
$239.75
Good quality x-ray gamma-ray ionizing radiation protective 0.5mmpb lead vest apron set radiological protection lead clothes
-3%
39%
$310.74
Genuine x-ray gamma ray protective super soft lead vest Hospital intervenient radiological protection 0.5mmpb trace lead vest
+3%
33%
$95.66
X-ray gamma ray protective lead shoe covers radioactive workshops radiological protection 0.5mmpb high quality lead shoe covers
+1%
30%
$96.96
X-ray gamma ray protective 0.5mmpb adult short lead apron hospital radiological protection doctor patient lead clothing
-22%
27%
$128.93
Genuine x-ray gamma ray protective dental apron hospital, dental clinic radiological protection high qulity 0.5mmpb lead apron
+8%
25%
$144.26
X-ray gamma ray protective sleeveless lead apron Interventional surgery radiological protection 0.5mmpb adult lead clothing
23%
$97.37
Genuine medical radiological protection 0.5mmpb lead short apron x-ray gamma ray radiation protective comfortable short apron
+1%
21%
$144.29
Recommend x-ray gamma ray protective 0.5mmpb dental apron with collar Radiology department radiological protection lead clothes
+1%
18%
$127.66
Good quality x-ray gamma ray radiation protective 0.5mmpb lead apron radiology department radiological protection lead clothes
-4%
16%
$76.84
Genuine x-ray gamma ray protective 0.5mmpb children lead apron radiology department radiological protection child lead clothes
+19%
15%
$94.40
x-ray gamma ray radiation protection 0.5mmpb lead triangle scarf set radiological protection patient use protective scarf
-7%
12%
$222.98
X-ray gamma ray radiation protective short sleeved lead coat nuclear radiation protection 0.5mmpb fashion lead clothing
+1%
11%
$190.34
Direct selling x-ray gamma ray radiation protective 0.5mmpb short sleeved lead apron radiological protection lead clothes
1%
$239.98
Genuine x-ray gamma-ray radiological protection 0.5mmpb lead short sleeved apron set nuclear radiation protective lead clothes
+1%
1%
$202.84
x-ray gamma-ray radiological protection 0.5mmpb children lead short sleeved apron set nuclear radiation protective lead clothes
1%
$240.36
Genuine x-ray gamma-ray radiological protection 0.5mmpb lead short sleeved apron set nuclear radiation protective lead clothes
1%
$3.33
Trippy Psychedelic Mushrooms Eye Collage Phone Case For iPhone 11 12 13 Pro Max XR XS X 8 7 SE 2020 6 Plus Clear Soft TPU Cover
1%
$7.55
For HONDA NC700S NC 700S NC700 S 2012 2013 CNC Aluminum Motorcycles Parts Side Stand Enlarger Plate Kickstand Enlarge Extension
-1%
1%
~
$570.00
Серьги с английским замком из золота
+10%
1%
$67.73
Комплект для ремонта трансмиссии 722,6 1402700861 1402701261 TCU Plate 1402701161, корпус клапана для Mercedes Benzs
1%
$9.46
Outdoor Gun Barrel Brush Tool Cleaning Kit Bagged Pipe Dredging Cleaning Brush Hunting Sport for AR15 AR10 M4 M16 Glock g17 g19
1%
$373.97
Новый комплект обтекателей для мотоцикла ABS подходит для CBR600 F4 CBR 600 99 00 CBR600F4 1999 2000 детали для кузова серебряный комплект
About
Contact Us
0.045, 8.89
7/.023,422 0=.000,107 1=.001,098/1 2=.000,830/1 3=.000,569/1 4=.000,463/1 5=.014,672/1 6=.000,202/1 7=.005,588/36
©
1994-2024
iMALL