Resource-Constrained Project Scheduling
sku: 43579283
16,330.00 руб.+25%
20,409.92 руб.
Shipping from: Russia
Description
This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.
Technical Details
age: | 0 |
author: | Christian Artigues |
genres_list: | 5311,5763 |
ISBN: | 9780470393840 |
lang: | en |
publisher: | John Wiley & Sons Limited |
Type: | book |
Форматы: |
Price history chart & currency exchange rate
Customers also viewed
3%
~ 13,570.00 руб.
Fabric for Fashion: The Swatch Book, Second Edition (An invaluable resource containing 125 fabric swatches)
abebooks.com-14%
1%
~ 14,490.00 руб.
Matthews 24x36" Cello Cucoloris, Cello "Cookies" Project a Subtle Pattern.
adorama.com1%
~ 9,160.00 руб.
The Essential Guide to Overland Travel in the United States and Canada: A Resource for Independent Travel and Camping
abebooks.com1%
~ 32,260.00 руб.
Toward More Sustainable Infrastructure: Project Evaluation for Planners and Engineers
abebooks.com-39%
1%
~ 6,290.00 руб.
Under Armour Boys Under Armour Project Rock 5 - Boys' Grade School Running Shoes White/Black Size 6.5
champssports.com1%
~ 7,930.00 руб.
SHRM-CP Exam Practice Questions: SHRM Practice Tests & Review for the Society for Human Resource Management Certified Professional Exam
abebooks.com1%
~ 12,810.00 руб.
Deadline Scheduling for Real-Time Systems: EDF and Related Algorithms (The Springer International Series in Engineering and Computer Science, 460)
abebooks.com1%
~ 11,710.00 руб.
Nomads of Luristan: History, Material Culture, and Pastoralism in Western Iran (The Carlsberg Foundation's Nomad Research Project) [first edition]
abebooks.com+7%
1%
~ 8,320.00 руб.
VEVOR Linear Guide Rail Set, SFC20 1200mm, 2 PCS 47.2 in/1200 mm SFC20 Guide Rails 4 PCS SC20 Slide Blocks 4 PCS Rail Supports, Linear Rails and Bearings Kit for Automated Machines CNC DIY Project
vevor.com+7%
1%
~ 14,130.00 руб.
VEVOR Linear Guide Rail Set, SBR25 1200mm, 2 PCS 47.2 in/1200mm SBR25 Guide Rails and 4 PCS SBR25UU Slide Blocks, Linear Rails and Bearings Kit for Automated Machines DIY Project CNC Router Machines
vevor.com+5%
1%
~ 6,770.00 руб.
VEVOR Linear Guide Rail Set, SFC20 1000mm, 2 PCS 39.4 in/1000 mm SFC20 Guide Rails 4 PCS SC20 Slide Blocks 4 PCS Rail Supports, Linear Rails and Bearings Kit for Automated Machines CNC DIY Project
vevor.com1%
~ 28,260.00 руб.
The Complete Conductor: A Comprehensive Resource for the Professional Conductor of the Twenty-First Century
abebooks.com1%
~ 7,220.00 руб.
All about Child Care and Early Education: A Comprehensive Resource for Child Care Professionals
abebooks.com1%
~ 6,190.00 руб.
Hallelujah: The Bible and Handel's Messiah, Resource Book (The Kerygma Program)
abebooks.com+6%
1%
~ 9,680.00 руб.
Under Armour Mens Under Armour Project Rock BSR - Mens Running Shoes Grey/Black Size 09.5
footlocker.com1%
~ 8,020.00 руб.
Effective Project Management : Guidance and Checklists for Engineering and Construction
abebooks.com+6%
1%
~ 9,680.00 руб.
Under Armour Mens Under Armour Project Rock BSR - Mens Running Shoes White/Distant Gray/Black Size 13.0
champssports.com1%
~ 7,910.00 руб.
Windows 7: The Definitive Guide: The Essential Resource for Professionals and Power Users
abebooks.com1%
~ 1,180.00 руб.
Брюки Stradivarius XAZ132649CKKS Темно-синие с красным, Брюки Stradivarius XAZ132649CKKS S Темно-синие с красным
rozetka.com.ua+6%
1%
~ 4,490.00 руб.
Cable Techniques LPS Low-Profile LPXLR-3F to TA3F Cable, 24" - White Caps
adorama.com