3D printer linear 42mm NEMA17 rod stepper motor TR8*4 250mm long lead screw
sku: 32839538846
ACCORDING TO OUR RECORDS THIS PRODUCT IS NOT AVAILABLE NOW
$42.00
Shipping from: China
Price history chart & currency exchange rate
Customers also viewed
37%
$93.76
Z-Axis Screw Aluminium Slide Table 85mm Stroke Linear Actuator Kit Apply Nema17/52 42/57 Stepper Motor Spindle Hole 52mm
walmart.com34%
$60.10
Screw Rod L100-350MM Nema17 Screw Stepper Motor 1.7A 40N.cm 17HS4401S-T8 With Copper Nut Lead 2/4/8mm -------- Stable Internal Structure
walmart.com32%
$51.62
3D Printer Z Axis Screw T8 Z Axis Diy C Beam CNC Sliding Table 250mm Linear Actuator Kit-Black
walmart.com29%
$54.65
3D Printer Z Axis Screw T8 Z Axis Diy C Beam CNC Sliding Table 250mm Linear Actuator Kit-Black
walmart.com23%
$31.20
NEMA09/20 Stepper Motor 20mm Linear Screw Stepper Motor Measurement Equipment For Diy Small Slider
walmart.com21%
$24.83
LAFGUR Stepper Motor Linear Miniature Slide Table Linear Bearing Screw Slider Nut 15 Small Motor Linear Moving Parts Motor Screw Slide Table
walmart.com18%
$22.75
ESTINK Stepper Motor Linear Stepper Motor Linear Miniature Slide Table Linear Bearing Screw Slider Nut 15 Small Motor Miniature Slide Linear
walmart.com11%
$23.90
MGN15H 250mm Linear Rail Guide with MGN15H Stainless Steel Carriage Block for DIY 3D Printers CNC Routers Lathes Mills
walmart.com9%
$32.24
FitBest Stepper Motor Mini Linear Screw Nut Slider 2‑Phase 4‑Wire For DIY Small Sliders 20mm
walmart.com1%
$40.91
Leke Horizontal 150/250/350mm T8 Dual Lead Screw Rod Linear Rail Support Guide Set
walmart.com1%
$80.00
Fichiouy Ball Screw Guide Sliding Table Linear Actuators + 23nema Stepper Motor 0.9NM 24V
walmart.com-8%
1%
~ $35.90
VEVOR 6000N Linear Actuator DC 12V Linearantrieb IP44 Elektrischer Linearmotor 250mm Hublänge Geräuschpegel ≤ 50dB Elektrische Türöffner 5 mm/s Fahrgeschwindigkeit Lineartechnik Verstellantrieb
vevor.com1%
$20.59
Coconut Ok Step Motor Driver Dm556 Suitble for Stepper Motor for Nema17 for Nema23
walmart.com1%
$57.60
Linear Guide Rail Linear Slide Rail Linear Motion Guide Rail Linear Guide Rail Hgh35 Linear Guide Rail 250mm HGH35 Linear Motion Shaft Guideway Bearing Steel For Machine
walmart.com1%
$49.99
VEVOR 1 Axis Lathe Linear Scale 250mm with Accuracy 0.0002" Optical Length Precision Linear Scale Aluminum Body for Mill Milling Lathe Machine with Accessories (250mm(10"))
vevor.com1%
$18.13
Linear Guide Rail Industrial Linear Sliding Guideway High Bearing Steel For CNC Machine 250mm
walmart.com1%
$65.99
VEVOR 1 Axis Lathe Linear Scale 250mm with Accuracy 0.0002" Optical Length Precision Linear Scale Aluminum Body for Mill Milling Lathe Machine with Accessories (250mm(10"))
vevor.com-21%
1%
$91.99
VEVOR Linear Guide Rail Set, SBR20 1500mm, 2 PCS 59 in/1500 mm SBR20 Guide Rails and 4 PCS SBR20UU Slide Blocks, Linear Rails and Bearings Kit for Automated Machines DIY Project CNC Router Machines
vevor.com1%
$60.85
Linear Motion Actuator IP65 Protection DC Micro Linear Actuator 250mm Stroke Pen Type 5mm Mounting Hole Dia For Lift Bed 12V
walmart.com1%
$26.70
Linear Sliding Guideway Stable Performance Sturdy Durable High Accuracy Linear Motion Rail Guide For CNC DIY Project 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm
walmart.com1%
$2.33
Wall Art Prints Canvas Painting Sydney Alaska Prague Retro Flower Market Botanical Nordic Poster Decor Pictures For Living Room
aliexpress.com1%
$16.91
Wooden Blocking Board With 324 Small Holes Granny Square Crochet Board For Setting Sewing Knitting Artworks
aliexpress.com1%
~ $59.00
11 retros low cool grey basketball shoes mens womens 11s sneakers for sale us 5.5-13 528895 003
dhgate.com