$ USD
€ EUR
руб. RUB
грн. UAH
eng
рус
укр
Home
Hot Sale
Notifications
Favorites
Stores
Search
aliexpress.com
/
Home Improvement
/
Computer & Office
/
Office Electronics
3D printer linear 42mm NEMA17 rod stepper motor TR8*4 250mm long lead screw
sku: 32839538846
ACCORDING TO OUR RECORDS THIS PRODUCT IS NOT AVAILABLE NOW
$42.00
~
1,770.00 грн.
$42.00, $1.00 = 42.15 грн.
~
4,720.00 руб.
$42.00, $1.00 = 112.26 руб.
~
€ 40.80
$42.00, € 1.00 = $1.03
Shipping from: China
the store does not ship to your country
Price history chart & currency exchange rate
Customers also viewed
in this store
in other stores
95%
$44.00
3D printer linear 42mm NEMA17 rod stepper motor TR8*4 300mm long lead screw
94%
$45.00
3D printer linear 42mm NEMA17 rod stepper motor TR8*4 350mm long lead screw
+16%
65%
$16.89
NEMA17 17HS3401 1.33A 3D Printer 42mm Linear Stepper Screw Rod Stepping Motor With TR8*4(P2)*324mm Shaft
64%
$27.20
3D printer linear stepper motor 42mm NEMA17 screw rod stepper motor Tr8 pitch2mm lead screw linear stepper Free shipping
56%
$18.09
1PC wantai 3D printer linear stepper motor NEMA17 42BYGHW811L200-2 200MM screw 48N.cm screw rod stepper motor TR8*8(P2) lead
54%
$18.69
1PC wantai 3D printer linear stepper motor NEMA17 42BYGHW811L200-2 200MM screw 48N.cm screw rod stepper motor TR8*8(P2) lead
46%
$31.00
NEMA 17 non-captive stepper motor 48mm body length with 200mm 300mm 400mm lead screw Tr8*8 NEMA17 linear stepper for 3D printer
43%
$28.00
Free shipping 3D printer stepper motor linear stepper motor 4.0Kg.cm NEMA17 42mm 2Phase stepper motor 300mm TR8*2(P1) 4wire 1.7A
41%
$18.70
5Pcs Nema 17 Stepper Motors Driver 42mm Flange 4 Lead 1.5A Linear Stepper Motor Nema17 for 3D Printer Engraver Machine CNC Kit
33%
$32.00
EU ship 1PC Nema17 Stepper Linear Motor 0.4A,0.24NM 343mm with Copper nut lead 8mm Tr8*8mm DIY Robot 3D Printer Z axis LONGS
31%
$27.36
EU FREE SHIP! Nema17 Stepper Linear Motor 0.4A,0.24NM 343mm with Copper nut lead 8mm Tr8*8mm DIY Robot 3D Printer Z axis LONGS
29%
$87.80
EU FREE SHIP! 3PCS Nema17 Stepper Linear Motor 0.4A,0.24NM 343mm with Copper nut lead 8mm Tr8*8mm DIY Robot 3D Printer Z axis
26%
$65.21
250mm Length Nema 17 External Linear Stepper Motor 48mm Stack 2.6A 4-lead Nema17 Linear Actuator with POM Screw Nut
-1%
25%
$17.35
1.8° 1.7A 4Kg.Cm NEMA17 42*40mm 42mm Linear Stepper Stepping Motor With Shaft Tr8*2(P1)*300mm For 3D Printer JL42HS40-1704AL
24%
$103.61
3D printer 42 motor motor linear screw stepper motor nema17 lead screw length 500mm tr8*8
18%
$33.85
NEMA17 linear stepper with Tr8*8 lead screw
15%
$46.00
Linear stepper motor Nema17 threaded rod stepper motor with 400mm length Tr8*4 lead screw
14%
$25.00
NEMA17 Stepper Motor Tr8*1 280/350mm Length Lead Screw Linear 1.68A 0.44N.m
-1%
13%
$48.60
17HS4401 42mm Through Screw Stepper Motor Shaft Tr8*8mm Nema17 1.68A Linear Stepping Motor With 200mm Screw
12%
$50.76
17HS4401 42mm Through Screw Stepper Motor Shaft Tr8*8mm Nema17 1.68A Linear Stepping Motor With 200mm Screw
-3%
9%
$48.60
17HS4401 42mm Through Screw Stepper Motor Shaft Tr8*8mm Nema17 1.68A Linear Stepping Motor With 200mm Screw
7%
$24.00
NEMA17 linear stepper motor Lead screw Tr8 pitch 1mm 42HS48-350A1 48mm body bipolar stepper motor
5%
$24.00
NEMA17 linear stepper motor Lead screw Tr8 pitch 1mm 42HS48-280A1 48mm body bipolar stepper motor
+1%
2%
$30.15
17HS4401 42mm Through Screw Stepper Motor JL42GT40-200N88 Shaft Tr8*8mm Nema17 1.68A Linear Stepping Motor With 200mm Screw
1%
$21.00
NEMA17 Stepper Motor Tr8*1 280/350mm Length Lead Screw Linear 1.68A 0.44N.m
1%
$36.00
17HS3001-450N82 Nema17 450mm Tr8*2 lead screw with POM Nut
1%
$53.00
NEMA17 ACME Lead Screw Linear Actuator with Nema17 Stepper Motor, DIY CNC Sliding Table Lead Screw Travel - 250mm
1%
$37.00
Belt Driven Linear Actuator Kit with Nema17 Stepper Motor, Z Axis DIY CNC Sliding Table Lead Screw Travel - 250mm
1%
$33.50
Nema17 Linear Stepper Motors,250mm Length, Tr8*8 Acme Leadscrew Threaded
1%
$48.00
Belt Driven V-Slot Mini V Linear Actuator with Nema17 Stepper Motor, Z Axis DIY CNC Sliding Table Lead Screw Travel - 250mm
-7%
1%
$9.81
Скребок для выравнивания стен из нержавеющей стали, 25/40 см
-2%
1%
$10.90
4.10/3.5-4 4.00-4 Heavy Duty Inner Tube Outer Tyre For Goped Scooter BladeZ Moby wheels 4 Inch Innertube Go Kart Karting ATV UTV
1%
$40.81
Сушилка для посуды, компактная нержавеющая сушилка для посуды и сушилка, сушилка для посуды с регулируемым поворотным носиком, серая
1%
~
$8.05
Детская футболка для мальчиков блогер Влад Бумага А4 (blogger Vlad A4) (25186-2618) Розовый 152
1%
$73.60
COMPTYCO AUA-40 Fiber Optic Identifier Live Fiber Optical Identifier with Built in 10mw Visual Fault Locator 800-1700nm SM MM
1%
$13.40
2021 облегающая шапка мужская шапка зимняя женская осенне-зимняя однотонная вязаная шерстяная шапка с арбузом
About
Contact Us
0.118, 7.76
6/.057,276 0=.002,081 1=.007,880/1 2=.010,963/1 3=.000,547/1 4=.019,111/1 5=.000,955/1 6=.017,820/36
©
1994-2025
iMALL